HomeE-Mail
PROFILEICE PRODUCTSICE PRODUCTSOTHER PRODUCTSCONTACT INFOCONTACT USINDUSTRY LINKSICE Far East Pte Ltd13 Pioneer Sector 2

Singapore 628374

Tel : (65) 861 3733

Fax : (65)861 3043

- January 2003

ICE 44-50 "Driving" The Way For The KPE Project

ICE Far East supplied the ICE Hydraulic Vibratory Hammer 44-50 for sheetpile installation for the Kallang Paya Lebar Expressway (KPE) project. The sheetpiles and H-beams were driven to a depth of 36m.

The highway, which will cost about S$1.8 billion, incorporates the longest 9 km road tunnel in South-east Asia and is the last leg of Singapore's 20 year expressway masterplan.

A 2 km stretch of the tunnel will run directly under and parallel to Pelton Canal, near the junction of Paya Lebar Road and the Pan-Island Expressway.

It will cut across the Geylang River and also across built up residential and industrial areas in Geylang, Paya Lebar and Airport Road.

When ready, motorists living in the north east corridor, in areas like Sengkang and Punggol will enjoy shorter travelling times to the city.

Left : The ICE 44-50 driving sheetpiles along the Geylang River

Right : Map showing the Kallang Paya Lebar Expressway route

 

 

   

-: Home : Company Profile : What's NewICE Products : Other Products : -

-: Regional Contacts : Industry Links : Contact Us :-

Best Viewed @800x600 pixels on


Copyright ©
ICE Far East Pte Ltd
Website Designed & Maintained by Trazz Adsolutions